top of page



A rewire repair in Hazel well Road.
Client:
Tim
Year:
2024
All chases, sockets switches and coving backed and skimmed level with existing plaster work.








bottom of page
Client:
Tim
Year:
2024
All chases, sockets switches and coving backed and skimmed level with existing plaster work.